Bid Forensics
Anti-fraud bid analysis & cost verification engine
Drag & drop bid files for forensic analysis
PDF, CSV, Excel, or text — multiple files supported
PDF bids analyzed server-side · CSV format: Description, Material, Labor, Equipment, Total
Bids Analyzed
3
Fraud Flags
5
2 critical
Savings Found
$355K
This batch
Portfolio Saved
$3.9M
47 bids total
Bids Rejected
12
18 renegotiated
ATM Benchmark
$128.5/SF
30-bay standard
Bid Analysis Results
Midwest Commercial Builders
FLAGATM Chicago Buildout · 8 ATM projects
$2.2M
$145.33/SF · 22wk
VALENCE Score
45/100
Fraud Risk
high
Flags
4
Savings
$355K
OH&P
12%
General Conditions: 38.1% above market
M2: pricing · Savings: $40K
General conditions $9.67/SF — possible staff padding
M3: labor · Savings: $40K
Lakeshore Construction
FLAGATM Chicago Buildout · New to ATM
$1.9M
$128/SF · 18wk
VALENCE Score
95/100
Fraud Risk
low
Flags
1
Savings
$0
OH&P
8%
Pacific Coast Construction
VERIFIEDATM Chicago Buildout · 15 ATM projects
$2.0M
$136.67/SF · 20wk
VALENCE Score
100/100
Fraud Risk
low
Flags
0
Savings
$0
OH&P
10%
TK 7 Mechanisms
Average score across all bids