Pacific Coast Construction

VERIFIED

ATM Chicago Buildout · License: IL-GC-88903 · 15 prior ATM projects

$2,050,000

$136.67/SF · 20 weeks

VALENCE Score

100/100

Fraud Risk

LOW

Flags Detected

0

0 critical

Savings Potential

$0

Historical CO Rate

3.8%

Within target

Bid vs Market Benchmark ($/SF)

Market Benchmark Within Range Elevated Flagged
Line ItemMaterialLaborEquipTotal$/SFMarketVarFlag
General Conditions$0$110K$0$110K$7.33$7.00+4.7%
Demolition & Site Prep$14K$88K$32K$147K$9.83$9.50+3.5%
Concrete & Masonry$82K$72K$19K$190K$12.69$12.00+5.8%
HVAC Ductwork & Equipment$138K$120K$52K$341K$22.73$21.33+6.6%
Electrical Rough-in$62K$105K$19K$205K$13.64$13.00+4.9%
Plumbing Rough-in$52K$82K$23K$173K$11.51$11.00+4.6%
Fire Protection$42K$60K$14K$128K$8.51$8.33+2.2%
TOTAL$390K$637K$159K$2,050,000$136.67/SF

Cost Composition by Trade

TK 7 Mechanisms Score

M1: OWN the Real Estate8.0

Ownership position secured

M2: VERIFY Every Dollar10.0
M3: STANDARDIZE the Design8.0
M4: PROCURE at Volume10.0

Material pricing within volume benchmark range

M5: War Room COORDINATE7.0
M6: AUTOMATE with LATTICE7.0

VALENCE analyzed 7 line items against 10 benchmarks

M7: ROBOTICIZE Over Time5.0

Pre-fab MEP racks: implemented

Fraud Flags (0)