Skip to content
DP
Back to jurisdictions

Omaha Permits & Inspections Division

Omaha, NE

Avg Review

20d

Rejection Rate

35%

Skill Files

8

Status

Medium

Ventilation — Omaha Type I Hood

2018 IMC 507 / NFPA 96
ventilation

Type I hoods per IMC 507. Exhaust 400 CFM/LF. Makeup air required. Cold climate — heated makeup air for -10°F design temp. Tornado-prone — secure rooftop equipment.

Examiner Note: Omaha follows standard IBC/IMC. Heated makeup air must account for Nebraska winter design temp. Fast review process.

Common rejection: Heated makeup air not sized for winter; rooftop equipment anchorage incomplete

Correction: Size heated makeup air for -10°F outdoor design temp. Show rooftop equipment anchorage. Include CFM calculations on M-1.

Fire Suppression — Omaha NFPA 96

NFPA 96 / UL 300 / Omaha Fire Prevention
fire

UL 300 suppression for Type I hoods. Omaha Fire reviews fire plans. Automatic gas shutoff. Manual pull station.

Examiner Note: Omaha Fire reviews as part of building permit. Include fire details in submittal.

Common rejection: UL 300 documents missing

Correction: Include UL 300 documents. Show suppression system on FP-1.

Plumbing — Omaha Grease Interceptor

2018 IPC / Omaha Public Works
plumbing

Grease interceptor per IPC. Omaha Public Works may review FOG. 3-comp sink. Handwash within 25 feet.

Examiner Note: Omaha follows standard IPC. Submit interceptor details with building permit.

Common rejection: Interceptor sizing missing from plans

Correction: Show interceptor sizing per IPC on P-1. Include fixture count and flow rates.

Electrical — Omaha Kitchen Circuits

2017 NEC
electrical

Standard NEC. GFCI within 6 feet of water. Emergency disconnect per NEC 422.33. Nebraska follows NEC with minimal amendments.

Examiner Note: Omaha follows standard NEC. Fast review.

Common rejection: GFCI not shown

Correction: Add GFCI within 6 feet of water on E-1. Show emergency disconnect.

Health — Omaha Food Facility

NE DHHS / Douglas County Health Dept
health

Douglas County Health Department reviews food facility plans. Handwash, 3-comp sink, FRP, sealed floors. Separate health review.

Examiner Note: Douglas County Health requires separate plan review. 2-3 week turnaround.

Common rejection: Health review not submitted; kitchen finishes not specified

Correction: Submit food facility plan to Douglas County Health. Specify finishes on A-series sheets.

Structural — Omaha Loads

2018 IBC §1607 / ASCE 7-16
structural

Seismic Design Category A. Low seismic. Snow load 30 PSF. Wind speed 115 mph. Tornado considerations. NE PE required.

Examiner Note: Omaha follows standard IBC structural. NE PE stamp required.

Common rejection: NE PE stamp missing; snow load calculations incomplete

Correction: Provide NE PE-stamped calculations. Include snow loads and wind design per ASCE 7.

ADA — Omaha Accessible Design

2018 IBC Ch. 11 / ADA 2010
ada

Standard IBC/ADA accessibility. Accessible route, restroom.

Examiner Note: Omaha follows standard IBC/ADA.

Common rejection: Accessible route not dimensioned

Correction: Show accessible route on A-1. Detail restroom per IBC Ch. 11.

Egress — Omaha Exit Requirements

2018 IBC §1006 / §1017
egress

Standard IBC egress. Two exits for 50+ occupants. Travel distance 250/300 feet.

Examiner Note: Omaha follows standard IBC egress.

Common rejection: Occupant load not on plans

Correction: Add occupant load per IBC 1004 on A-1. Show travel distance.