Skip to content
DP
Back to jurisdictions

Virginia Beach Permits & Inspections

Virginia Beach, VA

Avg Review

22d

Rejection Rate

38%

Skill Files

8

Status

Medium

Ventilation — Virginia Beach Type I Hood

VUSBC (2018 IMC w/ VA amendments) / NFPA 96
ventilation

Type I hoods per VUSBC mechanical provisions. Exhaust 400 CFM/LF. Makeup air required. Coastal humidity — dehumidification for makeup air. VA energy code applies.

Examiner Note: VB follows VUSBC. Coastal climate — address dehumidification of makeup air. Show on M-sheets.

Common rejection: Makeup air dehumidification not addressed; VA energy code not documented

Correction: Show dehumidified makeup air on M-1. Include VA energy code compliance documentation.

Fire Suppression — Virginia Beach NFPA 96

NFPA 96 / UL 300 / VA Statewide Fire Code
fire

UL 300 suppression. VB Fire Marshal reviews fire plans. Automatic gas shutoff. Manual pull station. VA Statewide Fire Prevention Code applies.

Examiner Note: VB Fire Marshal reviews as part of permit. Include fire details with building permit submittal.

Common rejection: UL 300 documents missing; fire suppression details incomplete

Correction: Include UL 300 documents. Show suppression system, gas shutoff, and pull station on FP-1.

Plumbing — Virginia Beach Grease Interceptor

VUSBC (2018 IPC w/ VA amendments) / VB Public Utilities
plumbing

Grease interceptor per VUSBC plumbing. VB Public Utilities may review FOG. 3-comp sink. Handwash within 25 feet.

Examiner Note: VB Public Utilities reviews interceptor as part of utility connection.

Common rejection: Interceptor sizing missing; VB Public Utilities review not initiated

Correction: Show interceptor sizing per VUSBC plumbing on P-1. Submit to VB Public Utilities.

Electrical — Virginia Beach Kitchen Circuits

2017 NEC w/ VA amendments / VUSBC
electrical

NEC with VA amendments per VUSBC. GFCI within 6 feet of water. Emergency disconnect per NEC 422.33. VA master electrician license.

Examiner Note: VB follows VUSBC electrical. VA electrical license required.

Common rejection: GFCI not shown; VA electrical license not on application

Correction: Add GFCI on E-1. Include VA electrical license on application. Show emergency disconnect.

Health — Virginia Beach Food Facility

12 VAC 5-421 / VDH
health

Virginia Department of Health (VDH) reviews food facility plans per 12 VAC 5-421. Handwash, 3-comp sink, FRP, sealed floors. VDH food establishment permit required.

Examiner Note: VDH requires plan review before food establishment permit. 3-4 week turnaround.

Common rejection: VDH plan review not submitted; food facility layout incomplete

Correction: Submit food facility plan to VDH per 12 VAC 5-421. Show all fixtures and finishes.

Structural — Virginia Beach Wind & Flood

VUSBC §1609 / ASCE 7-16
structural

Seismic Design Category B. Wind speed 140-150 mph (coastal). Flood zone requirements — many areas in SFHA. Equipment anchorage for wind. VA PE required.

Examiner Note: VB enforces wind design strictly due to coastal location. Verify FEMA flood zone and BFE (base flood elevation).

Common rejection: Wind load calculations incomplete for coastal zone; flood zone/BFE not addressed

Correction: Provide VA PE-stamped calculations with coastal wind loads per ASCE 7. Address FEMA flood zone requirements. Show BFE compliance.

ADA — Virginia Beach Accessible Design

VUSBC Ch. 11 / ADA 2010
ada

VUSBC accessibility per IBC Chapter 11 with VA amendments. Accessible route, restroom. VA follows federal ADA closely.

Examiner Note: VB follows VUSBC accessibility. Standard ADA compliance.

Common rejection: Accessible route not dimensioned; restroom details incomplete

Correction: Show accessible route on A-1 per VUSBC. Detail restroom with 60-inch turning circle.

Egress — Virginia Beach Exit Requirements

VUSBC §1006 / §1017
egress

VUSBC egress. Two exits for 50+ occupants. Travel distance 250/300 feet. Exit signs on emergency power.

Examiner Note: VB follows VUSBC egress. Standard review.

Common rejection: Occupant load not on plans; exit signs not on emergency power

Correction: Add occupant load per VUSBC on A-1. Show exit signs on emergency power.