Skip to content
DP
Back to jurisdictions

Oakland Planning & Building Department

Oakland, CA

Avg Review

38d

Rejection Rate

60%

Skill Files

8

Status

High Risk

Ventilation — Oakland Type I Hood

2022 CMC 507 / NFPA 96 / Oakland Municipal Code
ventilation
50% rejection

Type I hoods per CMC 507. Title 24 energy compliance. Oakland Building Electrification Ordinance may require all-electric kitchen in new construction. Makeup air 80-100% of exhaust.

Examiner Note: Oakland enforces building electrification ordinance. Verify if gas cooking is permitted. All-electric may be required for new construction.

Common rejection: Oakland electrification ordinance not addressed; Title 24 compliance missing

Correction: Verify Oakland electrification ordinance applicability. Submit Title 24 CF-1R. Show makeup air on roof plan. Address all-electric requirements if applicable.

Fire Suppression — Oakland CFC/NFPA 96

2022 CFC / NFPA 96 / UL 300 / Oakland Fire
fire

UL 300 suppression per CFC and NFPA 96. Oakland Fire Department reviews fire plans separately. Automatic fuel shutoff. NFPA 13 sprinkler modifications require OFD review.

Examiner Note: Oakland Fire requires separate fire plan review application. Submit concurrent with building permit.

Common rejection: Fire plans not submitted to Oakland Fire; suppression details incomplete

Correction: Submit fire plans to Oakland Fire Department. Show UL 300 system, NFPA 13 mods, gas shutoff on FP-1.

Plumbing — Oakland Grease Interceptor

2022 CPC / EBMUD Wastewater
plumbing

Grease interceptor per CPC Table 10-4. East Bay Municipal Utility District (EBMUD) reviews FOG compliance. 3-comp sink. Low-flow fixtures per CALGreen.

Examiner Note: EBMUD has FOG program. Submit interceptor details to EBMUD wastewater division.

Common rejection: EBMUD FOG review not initiated; interceptor sizing missing

Correction: Submit interceptor to EBMUD FOG program. Show sizing per CPC Table 10-4 on P-1.

Electrical — Oakland Kitchen Circuits

2022 CEC / Title 24 / Oakland Electrification Ordinance
electrical

CEC requirements. GFCI within 6 feet of water. Emergency disconnect. Oakland electrification ordinance may require enhanced electrical for all-electric kitchens.

Examiner Note: Oakland electrification ordinance impacts electrical design. Size panels for all-electric kitchen loads if applicable.

Common rejection: Electrical capacity insufficient for all-electric requirements; GFCI missing

Correction: Verify Oakland electrification requirements. Size electrical service for all-electric if required. Add GFCI per CEC. Submit CF-1R.

Health — Oakland Food Facility

CalCode §113700-114575 / Alameda County DEH
health

Alameda County DEH reviews food facility plans per CalCode. Handwash, 3-comp sink, FRP, sealed floors. Separate DEH plan review required.

Examiner Note: Alameda County DEH requires separate application. 4-6 week turnaround.

Common rejection: DEH plan review not submitted; food facility layout incomplete

Correction: Submit food facility plan to Alameda County DEH per CalCode. Show all fixtures and finishes.

Structural — Oakland Seismic Design

2022 CBC §1613 / ASCE 7-22
structural
42% rejection

Seismic Design Category D/E for Oakland. Hayward Fault proximity. Equipment anchorage critical. Soft-story retrofit may be required for older buildings. CA PE/SE required.

Examiner Note: Oakland has mandatory soft-story retrofit program. Verify if building is on retrofit list. Seismic calculations must address Oakland-specific site conditions.

Common rejection: Soft-story retrofit not addressed; seismic calculations incomplete for SDC D/E

Correction: Verify soft-story retrofit applicability. Provide CA PE/SE-stamped seismic calculations for SDC D/E. Show equipment anchorage on S-1.

ADA — Oakland Accessible Design

2022 CBC Ch. 11B / ADA 2010
ada

CBC 11B accessibility. CA standards exceed federal ADA. Accessible route, restroom per CBC 11B-604. Path-of-travel upgrades for renovations.

Examiner Note: Oakland enforces CBC 11B. Standard CA accessibility review.

Common rejection: CBC 11B requirements not met; path-of-travel analysis missing

Correction: Show accessible route per CBC 11B on A-1. Detail restroom per CBC 11B-604. Provide path-of-travel analysis for renovations.

Egress — Oakland Exit Requirements

2022 CBC §1006 / §1017
egress

CBC egress. Two exits for 50+ occupants. Travel distance 250/300 feet. Exit signs on emergency power.

Examiner Note: Oakland follows standard CBC egress.

Common rejection: Occupant load missing; exit door widths not shown

Correction: Add occupant load per CBC 1004 on A-1. Dimension exit doors. Show travel distance.